Benefits
- 175-MW project will generate energy to power the equivalent of more than 19,000 homes
- Delivered a deep-dive review, redesigned and submitted the first phase of the project within a tight schedule, and exceeded the remaining submittal deadlines
- Streamlined and accelerated the submittal process to beat all permit deadlines by using an extensive QA/QC procedure
The project was in mid-design when the client hired Tetra Tech, creating an aggressive schedule to complete the project by the client’s deadline. Our team was tasked with performing an in-depth review of the existing civil and structural designs to identify the deficiencies, omissions, errors, and fatal flaws. Tetra Tech made the necessary corrections, completed the site redesign, and ultimately obtained permit approval from the authority having jurisdiction.
Tetra Tech beat the client’s deadline by using our extensive engineering resources to complete the redesign activities and obtain the permit approvals.
[Tetra Tech] successfully re-designed the project and beat the aggressive civil permit approval deadlines we’d set for all phases of the Skipjack Solar Center Project.